- Joined
- Aug 5, 2008
- Messages
- 4,261
- Reaction score
- 1
- Points
- 0
From ISS On-Orbit Status Report for 28/02/2011.
In COL (Columbus Orbital Laboratory), FE-5 Paolo Nespoli wound up yesterday's replacement of the WOOV-8 (Water On/Off Valve-8) activities with a WOOV manifold by preparing the spare WOOV-8 for long-term on-orbit stowage and then stowing it temporarily in COL. The failed valve was prepacked for return on STS-133.
Working in Node 1, after first clearing out a sizeable amount of stowage goods, including the food pantry, to gain access, FE-6 Cady Coleman removed & replaced the failed RPCM (Remote Power Control Module) N14B_C. Paolo later assisted in replacing the Node 1 stowage. [The R&R was timed to take advantage of the power-down of the associated DDCU (DC-to-DC-Conversion Unit) Z14B on the Z1 Truss segment, safed Off during the EVA. Due to the temporary power-down, half the lights in Node 1 were out, as were the Node 1 cabin fan and smoke detectors; also some IMV (Intermodule Ventilation) valves were unpowered.]
After completion of DDCU Z14B power-up later today, Cady was to reactivate Node 1 power at UOP-1 (Utility Outlet Panel-1), required tomorrow for the CBCS (Centerline Berthing Camera System) activity during PMM berthing.
Cady also had ~2 hours 20 minutes reserved for floating through the ISS to set up 30 new RAMs (Radiation Area Monitors) delivered on STS-133. After the deployment throughout the station, she took digital pictures to document the placements. [The RAMs are color-coded; the new ULF-5 units are cherry-colored.]
In COL (Columbus Orbital Laboratory), FE-5 Paolo Nespoli wound up yesterday's replacement of the WOOV-8 (Water On/Off Valve-8) activities with a WOOV manifold by preparing the spare WOOV-8 for long-term on-orbit stowage and then stowing it temporarily in COL. The failed valve was prepacked for return on STS-133.
Working in Node 1, after first clearing out a sizeable amount of stowage goods, including the food pantry, to gain access, FE-6 Cady Coleman removed & replaced the failed RPCM (Remote Power Control Module) N14B_C. Paolo later assisted in replacing the Node 1 stowage. [The R&R was timed to take advantage of the power-down of the associated DDCU (DC-to-DC-Conversion Unit) Z14B on the Z1 Truss segment, safed Off during the EVA. Due to the temporary power-down, half the lights in Node 1 were out, as were the Node 1 cabin fan and smoke detectors; also some IMV (Intermodule Ventilation) valves were unpowered.]
After completion of DDCU Z14B power-up later today, Cady was to reactivate Node 1 power at UOP-1 (Utility Outlet Panel-1), required tomorrow for the CBCS (Centerline Berthing Camera System) activity during PMM berthing.
Cady also had ~2 hours 20 minutes reserved for floating through the ISS to set up 30 new RAMs (Radiation Area Monitors) delivered on STS-133. After the deployment throughout the station, she took digital pictures to document the placements. [The RAMs are color-coded; the new ULF-5 units are cherry-colored.]