Once the orbiter is vertical, the aft sling is disconnected from the main sling that goes around the orbiter and moved away and lowered to the transfer aisle floor.Are they really separated? I think they would be used simpler as one mesh file, at least they should be made a single vessel for using it.
Then the OV is twisted 45°s and lifted and moved into the high bay.
Here's a photo from the STS-114 demate operation. The aft sling can be seen attached to 175 ton crane with the OTS in the background in the Low Bay. Discovery is coming from High Bay 1: http://www-pao.ksc.nasa.gov/kscpao/images/large/05pd1219.jpg