New flight plan (UTC time):
-------------------
SUNDAY, SEPTEMBER 29
15:46:00 LIFT OFF
16:10:29 TLI BURN
---------
THURSDAY, OCTOBER 3RD
21:21:53 LUNAR ORBIT INSERCTION
----------
SUNDAY, OCTOBER 6
12:10:00 VERRAZZANO SPACECRAFT RENDEZ-VOUS AND DOCKING
-----------------
SUNDAY, OCTOBER 13
04:01:55 ORBIT APOAXIS DECREASING WITH ANTARES POWERED BURN
-------------
SUNDAY, OCTOBER 27
19:30:00 ANTARES-VERRAZZANO SEPARATION
-----------------
MONDAY, OCTOBER 28
20:12:20 TRANS EARTH INJECTION
----------------
SUNDAY, NOVEMBER 3RD
20:07:00 ATLANTIC OCEAN SPLASHDOWN
----------------
The news about this flight plan is an Antares 150 m/s powered burn in order to decrease lunar orbit apoaxis and simulate a deorbit burn.
Trans Earth Injection will be performet at the limit of the reentry window to simulate a bad condition and the need to perform a "fast" coming back
Launch live coverage on Orbiter Live Missions Sunday, September 29 at 15:00:00 UTC